{"id":1228,"date":"2026-07-14T03:08:27","date_gmt":"2026-07-14T03:08:27","guid":{"rendered":"https:\/\/isbm-blow-molding.com\/?p=1228"},"modified":"2026-07-14T03:08:27","modified_gmt":"2026-07-14T03:08:27","slug":"korean-k-beauty-ibm-container-oem-manufacturing-guide","status":"publish","type":"post","link":"https:\/\/isbm-blow-molding.com\/th\/korean-k-beauty-ibm-container-oem-manufacturing-guide\/","title":{"rendered":"Korean K-Beauty IBM Container OEM Manufacturing Guide"},"content":{"rendered":"
\n
\n
<\/div>\n
<\/div>\n
\n
\n
<\/div>\n

K-BEAUTY IBM OEM \u00b7 KOREAN COSMETIC PACKAGING \u00b7 MOQ \u00b7 FAI \u00b7 KOREA EVER-POWER<\/span><\/p>\n

<\/div>\n<\/div>\n

\u0e40\u0e04\u0e23\u0e37\u0e48\u0e2d\u0e07\u0e2a\u0e33\u0e2d\u0e32\u0e07\u0e40\u0e01\u0e32\u0e2b\u0e25\u0e35 (K-Beauty)
\nIBM Container OEM<\/span> Manufacturing Guide<\/h1>\n

Korean K-beauty brands sourcing IBM containers for cream jars, lotion bottles, toner bottles and serum bottles need to understand IBM OEM manufacturing workflow, Korean cosmetic container MOQ economics, mould development timelines, first article inspection (FAI) protocols, and Korean cosmetic supply chain requirements. This guide covers the complete K-beauty IBM container OEM programme from inquiry through commercial production on Korea Ever-Power ZQ series machines.<\/p>\n

MOQ \u2022 Lead Time \u2022 FAI<\/span>
\nMould Dev \u2022 QC Protocol<\/span>
\nKorean & Global K-Beauty Supply<\/span><\/div>\n

KOREA EVER-POWER \u00b7 \u0e40\u0e21\u0e37\u0e2d\u0e07\u0e2d\u0e31\u0e19\u0e0b\u0e32\u0e19 \u0e08\u0e31\u0e07\u0e2b\u0e27\u0e31\u0e14\u0e04\u0e22\u0e2d\u0e07\u0e01\u0e35 \u00b7 \u0e01\u0e23\u0e01\u0e0e\u0e32\u0e04\u0e21 2026<\/p>\n<\/div>\n<\/header>\n

 <\/p>\n

\n
\n
\n
<\/div>\n<\/div>\n

K-BEAUTY IBM OEM \u00b7 PROGRAMME QUICK REFERENCE<\/p>\n<\/div>\n

\n
\n

MOULD DEVELOPMENT<\/p>\n

30\u201360 days<\/p>\n

IBM mould set development at Korea Ever-Power Ansan-si: 30\u201345 days for standard cream jar or lotion bottle mould (4\u20138 cavity); 45\u201360 days for complex body shape, dual-material or large-format ZQ80\/ZQ110 mould<\/p>\n<\/div>\n

\n

STANDARD MOQ<\/p>\n

50,000 \u2013 200,000<\/p>\n

IBM container MOQ: 50,000 pcs for stock mould production (existing Korea Ever-Power standard mould); 200,000 pcs minimum for new custom mould development. Below-MOQ sample production: 1,000\u20135,000 pcs from stock mould at sample rate<\/p>\n<\/div>\n

\n

FAI TIMELINE<\/p>\n

7\u201314 days<\/p>\n

First article inspection: 50 pcs per cavity measured and documented; Korean brand QC review; lid torque check; dimensional report. FAI approval before commercial production order placed. Repeat FAI required if mould modification or material grade change<\/p>\n<\/div>\n

\n

COMMERCIAL LEAD TIME<\/p>\n

7\u201321 days<\/p>\n

Commercial IBM production lead time after FAI approval: 7\u201314 days for repeat orders on existing mould (existing PP resin stock, existing colour approved); 14\u201321 days for new colour or resin lot requiring Korean brand colour approval before production dispatch<\/p>\n<\/div>\n<\/div>\n<\/div>\n